News

Record electricity gain from the overhead line

In July 2024, the eHighway Schleswig-Holstein field trial reached two milestones. Since the start of operations at the end of 2019, the overhead line trucks have now covered 50,000 km connected to the overhead line, drawing 80,000 kWh of electrical energy.

Read more ➔

FESH at the State Representation in Berlin

BERLIN. Organized by the Schleswig-Holstein Ministry of Energy Transition (MEKUN) in conjunction with the State Ministry of Economics and Transport (MWVATT), a parliamentary evening will take place on 1 July 2024 at the State Representation in Berlin.

Read more ➔

FESH press conference on June 18, 2024

KIEL. Today, the FuE-Zentrum FH Kiel GmbH and the Ministry of Economic Affairs, Transport, Employment, Technology and Tourism of the State of Schleswig-Holstein (MWVATT) held a press conference on the future of the overhead line projects.

Read more ➔

Research work during maintenance 

The semi-annual maintenance of the eHighway test track on the A1 between the Lübeck and Reinfeld interchange took place in mid-April, which was then also used by the scientists to carry out further research installations and inspect existing ones.

Read more ➔

Impressions of the 11th Electromobility Forum

KIEL. This year’s Schleswig-Holstein Electromobility Forum at the end of November was well attended with over 450 participants despite the onset of winter. The specialist event brought together experts from companies, universities, administration and politics.

Read more ➔